Click here to receive your FREE Powerboss Business Information Pack
Hydraulic Presses Case Study |
Plastic Injection Case Study |
Plastic Injection Case Study 2.
Conveyors Case Study |
Escalators Case Study
Results speak for themselves. Powerboss provides a guaranteed return on investment, usually within two years.
These case studies show how Powerboss customers are saving money, reducing maintenance and increasing production.
Cyclic loads such as Injection Moulding machines are perfect applications for Powerboss. The hydraulic pump motor within the machine is only on load for a relatively short period of the total machine cycle; the period when the material is injected into the moulding tool. During the rest of the cycle the motor runs at around 5% load.
Plastic Injection Moulding -
The Benefits of Powerboss:
Soft Starter
Peak Demand Savings
Energy Saving Optimisation
Enhanced Signal Optimisation
Reduced Maintenance Costs
Quieter Machinery
Reduced Downtime
One of the world's leading suppliers of office automation, electronic devices and photographic equipment has been evaluating Powerboss for the last 18 months with excellent results.
Worldwide, the company employs in excess of 75,000 people. The group environmental vision "aims at pursuing sustainable management and continues environmental conservation practises" and Powerboss is seen as an important tool in reducing both energy costs and CO2 emissions.
In its manufacturing process, it employs many applications that are particularly well suited to Powerboss including plastic injection moulding and vacuum compressors to name just two.
Seven 22kW Powerboss units were fitted to plastic injection moulding machines producing paper trays and other associated components for photocopiers. The load cycle (time on-load versus time off-load) varies depending on the component being produced, but the three phase analyser showed that 40% on-load/60% off-load is typical. All seven injection moulding machines operate 24 hours per day 6 days per week.
It was identified that 24% kW savings were translated into a return of investment of less than two years with significant and quantifiable CO2 savings. The units have also given trouble free operation in continuous service over an 18 month period.
Annual Consumption: £1770.00
% Savings: 24%
Annual Savings: £425.00
Cost of Powerboss: £832.00
Return on Investment: 24 months
Hydraulic Presses Case Study |
Plastic Injection Case Study |
Plastic Injection Case Study 2.
Conveyors Case Study |
Escalators Case Study
Home |
The Product |
Business Opportunity |
Becoming a Distributor |
Starting a Business.
Motor Control |
Energy Saving |
Request Information